Description
The data was collected during instantaneous power loss and efficiency tests performed at The University of Manchester in 2018 and 2020 , on a 240kVA and 180kWh Siemens SieStorage lithium-ion battery energy storage system (BESS). The system is connected behind the meter to the low-voltage distribution network via a 260kVA, 400/433V TMC isolation transformer.
Date made available | 15 Sept 2021 |
---|---|
Publisher | UK Energy Research Centre |
Date of data production | 1 Dec 2018 - 30 Sept 2020 |