Beyond the up peak

Richard D. Peters, A. C M Sung

    Research output: Chapter in Book/Conference proceedingConference contribution

    Abstract

    The up-peak roundtrip time calculation (UPRTTC) was designed to be performed by hand calculation. Implemented in software, the UPRTTC can now be performed quickly and efficiently. However, the UPRTTC is incapable of assessing the performance of all but up-peak traffic in buildings where the main entrance is on the lowest floor. More flexible analysis techniques are possible, with calculations designed specifically to be implemented on computers. In this article, the authors compare two established software-based techniques - General Analysis and Simulation - with the UPRTTC, discuss their relative merits and compare the outcomes for some example buildings.
    Original languageEnglish
    Title of host publicationElevator World|Elevator World
    PublisherElevator World Inc.
    Pages66-71
    Number of pages5
    Volume48
    Publication statusPublished - Jul 2000
    EventElevator Technology 10, Proceedings of the ELEVCON 2000, ELEVCON 2000 International Conference -
    Duration: 1 Jan 1824 → …

    Conference

    ConferenceElevator Technology 10, Proceedings of the ELEVCON 2000, ELEVCON 2000 International Conference
    Period1/01/24 → …

    Fingerprint

    Dive into the research topics of 'Beyond the up peak'. Together they form a unique fingerprint.

    Cite this