Cost estimations for large scale engineering projects under various uncertainties --case study for the Myrrha machine with intelligent decision systems

D. Ruan, D. Maes, H. Aït Abderrahim, J. Liu, J. B. Yang

    Research output: Chapter in Book/Conference proceedingConference contributionpeer-review

    Original languageEnglish
    Title of host publicationhost publication
    Publication statusPublished - 2004
    EventThe IAEA Technical Meeting on “Increasing Instrument Calibration Interval through On-Line Monitoring Technologies” - Halden, Norway
    Duration: 27 Sept 200429 Sept 2004

    Conference

    ConferenceThe IAEA Technical Meeting on “Increasing Instrument Calibration Interval through On-Line Monitoring Technologies”
    CityHalden, Norway
    Period27/09/0429/09/04

    Cite this