@inproceedings{1b7b47f746774b1b8b73a2f700dd8fd6,
title = "Cost estimations for large scale engineering projects under various uncertainties --case study for the Myrrha machine with intelligent decision systems",
author = "D. Ruan and D. Maes and Abderrahim, {H. A{\"i}t} and J. Liu and Yang, {J. B.}",
year = "2004",
language = "English",
booktitle = "host publication",
note = "The IAEA Technical Meeting on “Increasing Instrument Calibration Interval through On-Line Monitoring Technologies” ; Conference date: 27-09-2004 Through 29-09-2004",
}