TY - GEN
T1 - Key Findings of a DS 2030
T2 - a study into future GB distribution network operations
AU - Carter, Sarah
AU - Williamson, Gillian
AU - King, James
AU - Levi, Victor
AU - Mcwilliam, Jamie
PY - 2017/10
Y1 - 2017/10
N2 - This study summarises the main findings from a detailed, large-scale technical study into distribution systems for 2030, recently completed on behalf of all the distribution network operators (DNOs) in GB. The study follows on from a study at CIRED 2015, ‘Development of Methods and Models for a Study into UK Distribution Systems of 2030’, and details both the technical and wider findings of the study.
AB - This study summarises the main findings from a detailed, large-scale technical study into distribution systems for 2030, recently completed on behalf of all the distribution network operators (DNOs) in GB. The study follows on from a study at CIRED 2015, ‘Development of Methods and Models for a Study into UK Distribution Systems of 2030’, and details both the technical and wider findings of the study.
UR - https://www.researchgate.net/publication/321202479_Key_findings_of_DS2030_-_a_study_into_future_GB_distribution_network_operations
U2 - 10.1049/oap-cired.2017.0947
DO - 10.1049/oap-cired.2017.0947
M3 - Conference contribution
VL - 2017
SP - 2390
EP - 2393
BT - International Conference & Exhibition on Electricity Distribution (CIRED)
ER -