Present status and first results of the final focus beam line at the KEK Accelerator Test Facility

ATF2 Collaboration, R. Apsimon, S. Boogert

Research output: Contribution to journalArticlepeer-review

Abstract

ATF2 is a final-focus test beam line which aims to focus the low emittance beam from the ATF damping ring to a vertical size of about 37 nm and to demonstrate nanometer level beam stability. Several advanced beam diagnostics and feedback tools are used. In December 2008, construction and installation were completed and beam commissioning started, supported by an international team of Asian, European, and U.S. scientists. The present status and first results are described.
Original languageEnglish
Article number042801
Pages (from-to)1-10
Number of pages10
JournalPhysical Review Special Topics - Accelerators and Beams
Volume13
Issue number4
DOIs
Publication statusPublished - 21 Apr 2010

Fingerprint

Dive into the research topics of 'Present status and first results of the final focus beam line at the KEK Accelerator Test Facility'. Together they form a unique fingerprint.

Cite this