The Importance of BIM Capability Assessment: An Evaluation of Post-Selection Performance of Organisations on Construction Projects

Abdul Majeed Mahamadu, Patrick Manu, Lamine Mahdjoubi, Colin Booth, Henry Abanda, Clinton Aigbavboa

    Research output: Contribution to journalArticlepeer-review

    1675 Downloads (Pure)

    Abstract

    Purpose: The emergence of Building Information Modelling (BIM) has led to the need for pre-qualification and selection of organisations capable of working within a BIM environment. Several criteria have been proposed for the assessment of an organisations BIM capability during the pre-qualification and selection phase of projects. However, no studies have sought to empirically establish whether organisations selected on the basis of such criteria have actually been the most successful at delivering BIM on projects. The aim of the study is to address the aforementioned gap through a comparison of predicted BIM capability and post-selection performance.
    Design/methodology/approach: BIM capability of firms in a case study was predicted using 28 BIM pre-qualification and selection criteria, prioritised based on their perceived contribution to BIM delivery success from a survey of practitioners on BIM-enabled projects. The comparison of predicted BIM capability and post-selection performance was on the other hand achieved through the application of the Technique to Order Preference by Similarity to Ideal Solution and Fuzzy Sets Theory (Fuzzy-TOPSIS).
    Findings: Findings underscore the reliability of the 28 BIM pre-qualification and selection criteria as well as the priority weightings proposed for their use in predicting BIM capability and likelihood of performance. The findings have highlighted the importance of criteria related as previous BIM use experience as well as information processing maturity as critical indicators of the capability of organisations particularly design firms.
    Originality/value: Overall, the findings highlight the need for prioritisation of BIM pre-qualification and selection criteria on the basis of their actual contribution to delivery success from post-selection evaluation of performance.
    Original languageEnglish
    JournalEngineering Construction and Architectural Management
    DOIs
    Publication statusPublished - 22 Jul 2019

    Research Beacons, Institutes and Platforms

    • Thomas Ashton Institute

    Fingerprint

    Dive into the research topics of 'The Importance of BIM Capability Assessment: An Evaluation of Post-Selection Performance of Organisations on Construction Projects'. Together they form a unique fingerprint.

    Cite this